Blue Pacific Minerals, Tokoroa
To successfully launch its Tokoroa facility, Blue Pacific Minerals needed equipment that could support safer, faster, and higher-quality liquid fertiliser production.
Contract Manufacturing | Mining
Our Projects Engineering excellence
Explore our case studies to see how we bring ambitious engineering visions to life across our capabilities.
Filter by Capability:
All
Contract Manufacturing
Design
Equipment
Maintenance
Projects
Filter by industry:
All
Civil Engineering
Condensers
Dairy
Food Processing
Forestry
Meat Processing
Mining
Packaging
Power & Energy
Pulp & Paper
Waste and Water
1
2
3
4
5
Te Ara Pekapeka Bridge
Peacocke Hamilton, Taurapa Pedestrian Cycle Bridge
Having been crowned as the category winner in SCNZ Exellence in Steel Construction in 2024, the architecturally stunning 71m-long pedestrian and cycling bridge is a prominent gateway (waharoa) to the new Waikato River crossing.
Projects | Civil Engineering
Hawkins Infrastructure Ltd
Cycle Bridge - Canada Street
An award-winning project constructing the Canada Street Cycle Bridge. The 160m Cycle Bridge links Canada Street in the Auckland CBD to the old Nelson Street Offramp in the central motorway junction.
Projects | Civil Engineering
Hawkins Infrastructure Ltd
Point Resolution Rail Bridge
Fabrication of the structural elements for the Point Resolution Bridge Project.
The project was initiated by the principal, Auckland Council, due to the advanced state of corrosion and structural degradation to the existing footbridge.
Projects | Civil Engineering
Downer – Kiwirail
Rotokauri Hub Pedestrian Rail Bridge
Bridge over rail lines with access ramps and stairs down to platforms. Walk through lattice truss structure with SHS members and aluminium panel balustrades.
Projects | Civil Engineering
Hamilton City Council
Hamilton Water Treatment Plant
PFS spooled all the piping while the civil works were being constructed, and then moved to site to install.
Maintenance | Waste and Water
OJI Fiber Solutions
Tasman Evaporator III
3 large pressure vessels were installed on seismic pedestals accessed by stairs and walkways to all levels with extensive Stainless and Carbon Pressure Piping.
Maintenance | Pulp & Paper
Fonterra
Fonterra Waitoa - D3 Dehumidification Ducting
Fabricate and install large diam ducts, during Covid Lockdown, for Waitoa Dairy factory upgrade of their Dehumidification Process Plant.
Projects | Dairy
MADE Market Spiral Staircase
MADE Market Spiral Staircase
The Made Market Spiral Stairway is a standout architectural element, seamlessly connecting the dining deck on level 3 with "The Sheds," a dynamic space housing art studios, a coffee roastery, and a boutique restaurant. The stairway’s aesthetic is both distinctive and impactful, characterized by its elegantly curved facade that tapers into the central column, evoking the appearance of fluted glass. This design not only adds a striking visual appeal but also harmonizes with the eclectic character of the surrounding environment, enhancing the overall experience for visitors.
Projects | Civil Engineering
Fonterra
Fonterra Hautapu - Stainless Boiler Stack
PFS was engaged to deliver a turnkey solution for the complete replacement of the Steam Boilers 1 and 2 stack, based on the design provided by Dobbie Engineering. The project scope included the safe removal and disposal of the existing stack, followed by the full supply, fabrication, and installation of a new 27m stainless boiler stack system. Our team managed all aspects of the project from start to finish, ensuring compliance with engineering specifications and seamless integration with existing plant infrastructure.
Projects | Dairy
Oji Kinleith
Oji Kinleith - SC01 Tank
PFS was engaged to provide a complete turnkey solution encompassing the design, fabrication, and installation of three stainless steel storage vessels.
Projects | Pulp & Paper
Contact Energy
Te Mihi Steam Dump Manifold
Main steam dump for the Te Mihi Geothermal Power Station for Contact Energy.
Contract Manufacturing | Power & Energy
Hawkins Infrastructure Ltd
Grafton Gully Bridge
Award-winning cycle bridge at Auckland University.
This bridge was designed to be an aesthetically interesting centrepiece to the cycleway project through Grafton Gully. Spanning a 20m gully with a 4m North-South fall, the bridge was developed as an ‘S’ Bend design with a constant fall of 10 degrees.
Projects | Civil Engineering
NZ Steel
NZ Steel KOBM Skirt Replacement
NZ Steel traditionally procured this sort of work from Europe. By getting us to do the work, the lead time was significantly reduced.
Projects | Power & Energy
Golden Bay Cement
Golden Bay Cement Silos
Detailed design, fabrication and installation of new silos was completed as part of a comprehensive new unloading, storage and dispatch facility build for Golden Bay Cement in Auckland.
Projects | Mining
OJI Fibre Solutions
OJIFS CD2 Flash Cyclone
Install of a new Stainless-Steel Flash Cyclone and Piping spools during the annual shutdown in March 2019.
Maintenance | Pulp & Paper
Link Alliance
CRL Normandy Temporary Services Bridge
A temporary walk-through truss bridge was constructed for the CRL project to carry services and provide access over the rail line under construction.
Projects | Civil Engineering
Genesis Energy
Huntly E3P Condenser
Condenser supply, manufacture and installation. The condenser comprised of 8 modules - Side A and B tube modules, A and B inlet/outlet water boxes, A and B return water boxes, steam inlet trunk and water outlet sump.
Projects | Condensers
Miraka Milk Powder Plant
Miraka Pipe Bridge & Steam Piping
Shop fabricate and install the pipe bridge and steam piping.
Projects | Dairy
Ballance Agri-Nutrients
Ballance Condenser Retube
Tubes in existing condenser had thinned and had to be replaced.
Maintenance | Power & Energy
OJI Fibre Solutions
Surface Condenser Replacement
Fabricated a condenser casing around the Lamella plate assembly so that the old unit could be removed and replaced during the Nov 2019 shut.
Maintenance | Pulp & Paper
Flovac
Flovac Vessel
Design and fabricate Vacuum Vessel for Flovac.
Contract Manufacturing | Waste and Water
Winstone Aggregates
Whitehall Quarry Primary Aggregate Bin
The fabrication and installation of a 25-tonne primary aggregate bin for Winstone at the Whitehall Quarry.
Projects | Mining
Genesis Energy
Huntly Condensate Water Polishing Plant
Genesis Power condensate polishing plant for water treatment in condenser boiler loop.
Capability | Waste and Water
Energy for Industry
Washdyke Energy Centre
Steam lines from a energy plant to a number of different industrial processing sites.
Maintenance | Power & Energy
Genesis Energy
Huntly Precipitation Plant Lids
Lids on top of precipitator on huntly power station had baddly corroded.
Capability | Power & Energy
Dealers for 20-50t Diggers
Bush Rigs Project
Design, fabrication, installation and 'readiness for forest' for brand new excavators going straight into forestry operation.
Forestry | Forestry
Carter Holt Harvey
Carter Holt Harvey no.2 Recovery Boiler Upgrade
Manufacture and installation of the superheater and screen tubes for the No 2 recovery boiler upgrade for Carter Holt Harvey Pulp & Paper.
Maintenance | Pulp & Paper
Veolia Water Solutions and Technologies
Pluto Onshore LNG Demin Water Plant
Supply, fabrication, assembly and testing of skid based Deminerlised Water Treatment Plant to the Onshore Pluto LNG site, Woodside Burrup PTY Ltd.
Capability | Waste and Water
Veolia Water Solutions and Technologies
Worsley Multi-Fuel Cogen Project-Condensate Treatment Plant
This project included the supply, fabrication, assembly and testing of a skid-based Condensate Treatment plant for the Worsley Multi-Fuel Cogen Project in Collie, WA.
Maintenance | Waste and Water
Siemens Pty
Huntly Condenser Module Replacement
Siemens Energy Pty engaged PFS Engineering to design, develop, and implement a full skidding arrangement to remove and replace two 60t condenser modules for three Huntly Power Station generation units.
Maintenance | Power & Energy
Carter Holt Harvey
Kinleith #8 Boiler
The generating bank repair required the cutting out and removal of tubes and replacement.
Maintenance | Pulp & Paper
Orica
Orica Mixed Bed Skid
Water treatment skid for Oricas plant in Sydney.
Project | Waste and Water
Sunshine Electricity
Condong & Broadwater Condensers
Sunshine Electricity chose us to build them condensers for a Sugar mill biomass cogeneration water plant.
Capability | Condensers
CRS Industrial Water Treatment Systems
CRS Water Treatment Skids
Fabricated 18 Skids for CRS Industrial Water Treatment System's Gorgon LNG Plant on Barrow Island, Australia.
Contract Manufacturing | Waste and Water
Fonterra
Fonterra Boiler Auxiliary Installation
Fonterra's Heat Recovery Boiler in Te Awamutu failed which contributed to the plant having to shut down. We urgently manufactured and installed a temporary 20m stack for the relocated boilers.
Contract Manufacturing | Industry
Inghams
SS Conveyors for Poultry Plant
Designed and fabricated conveyors to fit into the existing Inghams Poultry Plant food processing line and Building.
Contract Manufacturing | Food Processing
Australian Paper
Australian Paper Economiser Refurbishment
Refurbishment work was carried out on the Economiser during a factory shut at Australian Paper. There have been several factory shuts where this work and other work has been completed for Australian Paper.
Capability | Pulp & Paper
Australian Paper
Australian Paper Evaporater Gas Duct
Replaced the existing gas duct to the Evaporator during a factory shut at Australian Paper.
Maintenance | Pulp & Paper
Fletcher Construction
Cradle for Tunnel Boring Machine SH20
Fabrication of a purpose-designed cradle to support the TBM – ‘Alice’ before she commenced tunnel boring.
Contract Manufacturing | Civil Engineering
Genesis Energy
Mangaio Mini Hydro
Fabricated in-house and installed onsite the mechanical components for the tunnel plug, penstock pipes, bifurcation and outfall transition during a planned outage to the Genesis Energy Mini Hydro Scheme in Mangaio.
Maintenance | Power & Energy
SLN
SLN Ducting
Fabricated and shipped large heavy ducts for process upgrade to a nickel plant.
Maintenance | Mining
Electrix
Gas Piping
Gas piping and supports for the Gas Network , including gas lines over bridges.
Maintenance | Power & Energy
Veolia Water Solutions & Technologies Pty Ltd
McKee Water Treatment Plant
Installation of Reverse Osmosis and Demineralisation skids, potable water plant and associated PVC piping for Todd Energy’s McKee Peaker Plant.
Capability | Waste and Water
GEA Processing
Holding Tube Pipes
Manufacture of Holding Tubes & Framework for GEA's Processing Factory.
Maintenance | Dairy
Contact Energy
Wairakei Bio Reactor
Fabrication and installation of pump tubes and delivery pipes to a Contact Energy Bio-Reactor which uses sulphur oxidising bacteria to remove up to 80 per cent of hydrogen sulphide.
Maintenance | Power & Energy
Yashili Dairy Factory
Yashili Pipe Bridge
Full fabrication set of drawings as well as assembly and installation were completed after design for the pipe bridge was handed over by Babbage.
Projects | Dairy
Fonterra
Dairy Manifolds
Fabrication of manifolds that were installed on-site and connected to a specialist process plant.
Maintenance | Dairy
Contact Energy
Wairakei Western Borefield
Main contractor to Contact Energy for the Western Borefield Project, in which two new geothermal production wells and one reinjection well were connected to Contact Energy steam lines.
Projects | Power & Energy
PFS Customised Cabinetry
As well as our range of electrical enclosures we build & design to customers' requirements to suit all food, dairy & industrial application.
Contract Manufacturing | Industry
OnGas for Vector
Springhill LPG Vessel
OnGas horizontal bullet vessel at Springhill prison was able to contain more gas than was consented. The vessel had to be reduced in size.
Maintenance | Power & Energy
Custom Product for Dairy Food Processing
Dairy Processing
Design & Manufacture of Food Processing Equipment.
Design | Dairy
Tetrapak
SS Platforms for Dairy and food processing
New platforms for Tetrapak for a Fonterra Diary Plant in South Island.
Maintenance | Dairy
Contact Energy
Te Rapa Boiler
Maintenance works for Contact Energy's Energy Plant at Te Rapa Diary factory during annual shut.
Maintenance | Dairy
GEA
Fonterra Lichfield Steam and Condensate piping system
Worked with GEA to install a full high and low-pressure steam system into Fonterra Lichfield’s new dryer facility in South Waikato from October 2015 till June 2016.
Projects | Dairy
Fulton Hogan
Steel form – AMETI Bridge Pier
Steel form for AMETI bridge – unique shape with all surfaces curved in 3 dimensions.
Projects | Civil Engineering
Wairakei Powerstation
Non-Combustable Gas Upgrade
Wairakei Powerstation removed non-combustable gas from their condensers using a steam system. The project was to upgrade the system, thereby using the steam to generate more power.
Maintenance | Power & Energy
OJI Fibre Solutions
Kinleith September Shut 2016 - 1st and 4th Effect Replacement Evaporator 5
During the September shut in 2016 we were engaged by OJI to complete the 4th effect shell and 1B lamella replacement. We had a strict deadline of 11 days to complete the work.
Maintenance| Pulp & Paper
OJI Fibre Solutions
OJI Fibre Evaporators
During the September shut in 2016, we were engaged by OJI Fibre Solutions to complete the 4th effect shell and 1B lamella replacement. We had a strict deadline of 11 days to complete the work.
Maintenance | Pulp & Paper
Tatua Dairy Company
Tatua Waste Water holding tanks
Upgraded Tatua Dairy Plant's waste water system. Fabricated 2 # stainless steel Holding tanks.
Maintenance | Waste and Water
Laminex
Laminex Board Plant - Resin Lines & Vessels
Relocated Laminex's resin lines and vessels into a new line at their Auckland Board plant.
Maintenance | Pulp & Paper
Ballance Agri-Nutrients
Ballance Waipukurau Dispatch Plant
Ballance Waipukurau Dispatch Plant Upgrade.
Maintenance | Industry
Ballance
Fertco Flail Mill
Specialist design and fabrication of a new mill to replace the crusher roller used to process fertilizer into a finer more consistent size by removing lumps.
Contract Manufacturing | Industry
Inghams
Platforms to Inghams Feedmill
Close to Ruakura, Inghams have several grain silos to process and store feed for their facilities in the Waikato. The access platforms and stairs to these silos were improved.
Maintenance | Industry
GEA
Horotui Steam and Condensate Piping
Fabricated and installed steam and condensate piping to the new Open Country Dairy dryer plant facility while being built at Horotui.
Maintenance | Dairy
Evonik Peroxide Limited
Evonik De-Bottlenecking Project
There was a bottleneck in the process plant producing peroxide. The solution was to increase the size of the two peroxide pressure vessels.
Maintenance | Power & Energy
Bishop Construction
Napier Tank Farm - Fire System Upgrade
Spooled galvanised piping for the Fire System on the Napier Tank Farm.
Maintenance | Dairy
OJI Fibre Solutions
Kinleith #5 Recovery Boiler
In a shut in November 2019, refurbishment work on the #5 Recovery Boiler, Superheater. Also worked on the #8 Primary Boiler.
Maintenance | Pulp & Paper
OJI
Kinleith #4 Recovery Boiler
Cut out existing airports and replaced with straight tubes.
Maintenance | Pulp & Paper
OJI Fibre Solutions
Kinleith #8 Primary Boiler
PFS has for years during the annual shuts done refurbishment work on the OJI boilers. In the shut in late 2019 PFS worked on both the #8 Primary Boiler and the #5 Recovery boiler.
Maintenance | Pulp & Paper
Carter Holt Harvey
Tasman #2 Recovery Boiler
PFS Manufactured and installed a super heater and screen tubes for the No.2 Recovery Boiler upgrade.
Maintenance | Pulp & Paper
PFS Manufactured and installed a super heater and screen tubes for the No.2 Recovery Boiler upgrade.
Fletcher Wood Products
Cyclone Project – Taupō, New Zealand
PFS Engineering was engaged to manufacture 13 large-scale material-sorting cyclones for Fletcher Wood Products, supporting the new Laminex wood panel manufacturing line in Taupō.
Contract Manufacturing | Engineering