Projects | Mining Whitehall Quarry Primary Aggregate Bin

The fabrication and installation of a 25-tonne primary aggregate bin for Winstone at the Whitehall Quarry.

Bin feeds the primary crusher through a conveyor system. Bin fully pre-fabricated in the workshop to facilitate transport and assembly on site. Installation and assembly of the bin at Whitehall Quarry. Bin is sized to take a full load (impact & volume) from a pay hauler end tipping from the bench above.