PFS spooled all the piping while the civil works were being constructed, and then moved to site to install.

Works included:

  • Value solution in SS vs carbon.
  • Large bore SS Piping.
  • Large lobster back bends.
  • Installation of large pumps and valves.
  • Installation of UV filtration system.
  • Heavy Stainless steel brackets to support precast troughs over filter beds.
  • Connect to underground CLSP incoming mains.