Maintenance | Dairy Miraka Pipe Bridge & Steam Piping

PFS was brought in to shop fabricate and install a new pipe bridge and steam piping.

Project included:

  • Pipe bridge in 3 sections.
  • Join 60m of pipe bridge in the shop.
  • Spool and fill with steam pipes and insulate, as well as stainless condensate or water pipes.
  • Cut the pipe at the end of each section to be rejoined on site after erection.
  • Site installation of pipe bridge.
  • Steam piping was run to process plants and tanks, connecting and insulating them.
  • Commission statutory inspection plant and complete MDR.