Maintenance | Pulp & Paper Pluto Onshore LNG Demin Water Plant

Replaced the existing gas duct to the Evaporator during a factory shut at Australian Paper. 

Key Features:

  • Isolation of all services at the start of the shut. 
  • Removed existing gas duct.
  • Replaced gas duct with new ducting. 
  • Cranage and rigging. 

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.