Maintenance | Pulp & Paper Kinleith #4 Recovery Boiler

Cut out existing airports and replaced with straight tubes.

Key Features:

  • All work done during a shut.
  • Cut out existing airports and prepped tube ends.
  • Bent tubes to tie into existing tubes at the top and bottom of airport.
  • Welded tubes NDT and hydro.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.