Maintenance | Pulp & Paper Kinleith #5 Recovery Boiler

In a shut in November 2019, refurbishment work on the #5 Recovery Boiler, Superheater. Also worked on the #8 Primary Boiler.  

Key Elements:

  • Realign 3 superheater pendants.
  • Cut tube and take tube samples.
  • Replacement of barrel to a heat exchanger with one fabricated before the shut by PFS. 

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.