Contract Manufacturing | Civil Engineering Cradle for Tunnel Boring Machine SH20

Fabrication of a purpose-designed cradle to support the TBM – ‘Alice’ before she commenced tunnel boring.

Key Elements:

  • Cradle overall was approximately 18m long and 10m wide. 
  • Made in 4 sections for transport, then bolted together on site. 
  • Heavy plate Welded beams to support TBM. 
  • Full penetration butt welds of diagonal support to the frame. 
  • Rail to spread the load of TBM and allow it to jack off.

Challenges:

  • Matching up 4 different fabricated sections - trialled assembly in the shop.
  • Heavy plate welded beam FPBW to frame at an acute angle
  • Unique rail profile to support TBM. 
  • Structural bolted splice joints. 
  • Structure to take unusual loads of TBM jacking forward into the tunnel.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.