Maintenance | Power & Energy Wairakei Powerstation Non-Combustable Gas Upgrade

Wairakei Powerstation removed non-combustable gas from their condensers using a steam system. The project was to upgrade the system, thereby using the steam to generate more power.

Key Features:

  • Removed and replaced new structual frame to support all vessels and piping.
  • Replacement has header pipe from condenser to the NCG system.
  • New steam line with block and bill valves. 
  • New cyclone vessels.
  • New stainless steel piping down to NCG skid.
  • Installed and connected NCG skid from USA which vacuum pumps.
  • Replaced transformer, 11KV and other power and control cabling.
  • New platform and walkway and new electrical control cabinets at high level.
  • Reinjection of condensate into the outfall ducting below the power station.
  • Insulation of Steam piping.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.