Maintenance | Power & Energy Evonik De-Bottlenecking Project

There was a bottleneck in the process plant producing peroxide. The solution was to increase the size of the two peroxide pressure vessels. 

Key Features:

  • Detailed design of the 2 peroxide pressure vessels.
  • Procured duplex plate and domed ends and fabricated pressure vessels prior to the shut.
  • Procured and pre-spooled all piping and install as much as possible ahead of the shut
  • Fabricated skids for pumps and specialist plant and installed ahead of the shut.
  • Fabricated all structure to fit within existing structure to support the new vessels and flooring.
  • During the shut replaced old vessels with new.
  • Installed new heat exchangers.
  • Connected all pipe work.
  • In the oxidiser tower installed new trays, nozzles and supports.
  • New manways to the tower.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.