Maintenance | Condensers Huntly E3P Condenser

Condenser supply, manufacture and installation. Comprised of 8 modules - Side A and B tube modules, A and B inlet/outlet water boxes, A and B return water boxes, steam inlet trunk and water outlet sump.

The total weight empty is 200,000 kg plus, and it incorporates over 11,000 tubes. PFS worked 24 hours a day to meet the original delivery and was ahead of schedule.

Features:

  • Total weight (empty): 200,000kg plus.
  • Manufactured to AS1210 - class 2A tube-side and class 3 shell-side.
  • Tubes - 11884# - 316L - diameter 25.4 OD x 0.6mm wall thickness.
  • Tubes expanded in tube plate, ends cut back and faced, welded with orbital tig welders.
  • Tube plate - 4# - 316L stainless steel bonded to carbon steel backing plate.
  • Sag plates - 44# out of 16 and 25mm plates.
  • PFS worked 24 hours a day to meet the original delivery of 20 December 2005.
  • PFS worked with Downers to skate the condenser into position. Fit on spring supports and weld two modules together.
  • Welding onto steam turbine.
  • Flood test and shop and site NDT were all very successful.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.