Maintenance | Pulp & Paper Carter Holt Harvey no.2 Recovery Boiler Upgrade

Manufacture and installation of the superheater and screen tubes for the No 2 recovery boiler upgrade for Carter Holt Harvey Pulp & Paper.

Key Features:

  • This project was run in conjunction with the critical valve project carried out during the total mill shutdown in 2002.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.