Capability | Pulp & Paper Kinleith #8 Boiler

The generating bank repair required the cutting out and removal of tubes. The tubes were then replaced.

The project included:

  • The cutting out of tubes.
  • Windows were cut out to reach the weld behind.
  • Restricted access to weld and fit new tubes, weld through window.
  • Seal up the window.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.