Maintenance | Pulp & Paper Tasman #2 Recovery Boiler

PFS Manufactured and installed a super heater and screen tubes for the No.2 Recovery Boiler upgrade.

The project included:

  • Procure boiler tubes from offshore.
  • Bend tubes to different radii to suit return tubes.
  • Shop manufacture the new heater banks.
  • NDT and hydro test superheater tube banks.
  • Crane superheater bank from the truck.
  • Lower through the roof of the recovery boiler.
  • Weld bank into headers.
  • Bring the recovery boiler back into operation after the hydro test.