Maintenance | Power & Energy Mangaio Mini Hydro

Fabricated in-house and installed onsite the mechanical components for the tunnel plug, penstock pipes, bifurcation and outfall transition during a planned outage to the Genesis Energy Mini Hydro Scheme in Mangaio. 

Key Features:

  • Shop fabrication and onsite installation. 
  • Tunnel Plug and approximately 200 meters of penstock piping.
  • Bifurcation and Outfall Transition.
  • Powerhouse Access Platforms and Walkways, Monorail and Roof.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.