In a Shut in November 2019 PFS as well as work on the #8 Primary Boiler did refurbishment work on #5 Recovery Boiler, Sperheater.
The work done in the shut included:
Realign 3 superheater pendants
Cut tube and take tube samples
Replacement of barrel to heat exchanger with one fabricated befor the shut by PFSCustomer: OJI Fibre Solutions
Location: Kinleith
Industry: Pulp and Paper