Huntly Condenser Module Replacement

 
Huntly Condenser Module Replacement

PFS Engineering were engaged by Siemens Energy Pty to design develop and implement a full skidding arrangement to remove and replace 2 60t condenser modules for 3 of the Huntly power station generation units. This included full bracing of the ground floor through to the basement level to handle the increased load. The following scope of works were thereafter completed by PFS Engineering.

  • Removal of inlet and outlet water boxes. PFS then transported the oversized units to their respective painting facility to be blasted, hydrogen peroxide treated and re coated with 100% solids coating.
  • Full re tube of main boiler feed pump condenser and re coating of respective water boxes and covers.
  • Installation of complete Taprogge ball cleaning system including deflection plates and ball collector into water boxes.
  • Installation of sacrificial anodes into water boxes.

Customer: Siemens Pty
Location: Huntly Power Station - Genesis Energy
Industry: Power Generation
 
 
 
 
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
Huntly Condenser Module Replacement
 
 
 
Enquire

Fill in the form below to enquire about this service. Please make sure you fill in all required (*) fields.

Name *
 
Email Address *
 
 
Comments