Supply, fabrication, assembly and testing of a skid-based Demineralised Water Treatment Plant to the Onshore Pluto LNG site, Woodside Burrup PTY Ltd.
Supply, fabrication, assembly and testing of a skid-based Demineralised Water Treatment Plant to the Onshore Pluto LNG site, Woodside Burrup PTY Ltd.
Fifteen skids in total with additional interconnecting pipe work and pipe racks. Skids were completed in our Hamilton workshops and transported to the Port of Mt Maunganui and shipped to Karatha on the Burrup Peninsula, WA.
Demineralization is a common process used in chemical, petrochemical, oil refining, semiconductor manufacturing and utility plants.
The process uses several process (Cation exchange, Ion exchange, reverse osmosis, filtration) to remove salts, minerals, metals and dissolved solids. PFS Engineering supplied, fabricated, assembled and tested the following skid based Demineralization plant.
Process skids and operations as below (2 train process):