Maintenance | Power & Energy KUPE LNG Plant - Pressure vessels for MEG skid

Fabricate the vessels for the MEG skid which included:

  • Distillation column 18m long.
  • 16 nozzles.
  • Flash separator.
  • Duplex Insert of 20mm thick plate.
  • Cone 16mm thick reducing from 3000mm to 150mm.
  • Vessels to ASME 8.
  • 100% NDT.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.