PFS spooled all the piping while the civil works were being constructed, and then moved to site to install.
Works included:
- Value solution in SS vs carbon.
 - Large bore SS Piping.
 - Large lobster back bends.
 - Installation of large pumps and valves.
 - Installation of UV filtration system.
 - Heavy Stainless steel brackets to support precast troughs over filter beds.
 - Connect to underground CLSP incoming mains.