Wairakei Powerstation removed non combustable gas from their condensers using a steam system. The project was to upgrade the system therby using the steam to generate more power. The system included:
remove and replace new structual frame to support all vessels and piping.
replace has header pipe from condenser to the NCG system
New steam line with block and blled valves
New cyclone vessels
New stainless steel piping down to NCG skid
Install and connect NCG skid from USA which vacuum pumps
Replace transformer, 11KV and other power and control cabling
New platform and walkway and new elctrical control cabinets at high level.
Reinjection of condensate into the outfall ducting below the powerstation
PFS Engineering has a dedicated Project Management and Engineering Team dedicated to managing from inception to delivery and commission large scale multi disciplined projects.